___________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________

Parametric Cloud | 전시회 | 서울시 강남구 | 2011
수표지구 주상복합
| 계획 설계 | 서울시 중구 | 2011

  이태원 빌딩 | 기본 계획 | 서울시 이태원동 | 2011
남양주 타운하우스 | 기본설계 | 남양주시 | 2011
국제유통단지 | 기획설계 | 광명시 | 2011
큐브타운
| 기본계획 | 제주도 건입동 | 2011
한남동 갤러리
| 기본계획 | 서울시 한남동 | 2010
NEXON 넥슨 사옥 | 사업성 검토 | 서울시 강남역 | 2010
  예다손 친환경 공장 | 기본계획 | 전라남도 영암군 | 2010
여의도 주상복합 | 기본계획 | 서울시 여의도 | 2010
군산골프장 호텔
| 공사중 | 전라북도 군산시 | 2009-2010
국립현대미술관-서울관 | 공모전 | 서울시 | 2010
거창클럽하우스
| 기본검토 | 경상남도 거창 | 2009
남양휴튼모델하우스 | 디자인 제안 | 경기도 남양주시 | 2009
  Art Fund Pavilion | competition entry | Woking, UK | 2009
Urban Intensity | ongoing research | Worldwide | 2008 - present
City Hall | honourable mention | Sejong, Korea | 2008
Foot Bridge | competition entry | Sheffield, UK | 2007
Asian Cultural Centre | competition entry | Gwangju, Korea | 2005
Mountain Hut | competition entry | California, USA | 2003
  World Trade Centre, Tower 3 | detail design | NY, USA | 2008-2009 | Rogers
60K Housing | built | Milton Keynes, UK | 2007-2008 | Rogers
Javits Convention Centre | concept design | New York, USA | 2006| Rogers
Mixed Use Complex | under construction | Seoul, Korea | 2005 -2008 | Rogers
National Tennis Centre | built | Roehampton, UK | 2004 - 2005 | Hopkins
Maritime Plaza | second prize | Keelung, Taiwan | 2004 | Farjadi Architects
  송원학원 | 완공 | 광주광역시 | 1996 - 1999 | 금성건축
광주시청 | 완공 | 광주광역시 | 1996 - 1999 | 금성건축
의재미술관 | 공모전, 2등 | 광주광역시 | 1997 | 금성건축
   
___________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________
60K HOUSING | MILTON KEYNES, UK Five days to complete a house 145 houses in Oxley Woods, Milton Keynes, UK Street view Under construction Cladding work View from the corner window For further information
A total of 145 homes will be built on the three- hectare site. There are 11 house-types ranging from two bedroom maisonettes to five bedroom family houses, providing a mixture of affordable housing and larger private dwellings in two- and three-storey houses around a central street. The volume of the house is adaptable both in terms of orientation, regional variation of scale, proportion and material and is conceived for life-long living, with an inherent flexibility both in the short and long term. Internal layouts are free-span – ie without structural pillars and walls, maximising flexibility. To further enhance the range of choice, the Team envisages a range of add-on elements to give distinct identity. These elements include canopies, balconies, planted walls and study rooms.

The houses use Modern Methods of Construction, taking advantage of a range of technologies and processes involving various forms of supply chain specifications, prefabrication and off-site assembly. Not only does this reduce construction time but it minimises waste and energy used in the transportation of materials to site by eliminating the need for heavy machinery and construction traffic.

Modern Methods of Construction allow components to be manufactured off-site, either as modules or ‘flat-pack’ for ease of transportation. Not only does this decrease construction times, it also reduces waste and energy used in the transportation of materials to site. Even without the distinctive EcoHat, the Oxley Woods houses represent a reduction of approximately 27 per cent in carbon dioxide emissions, compared with a conventional new-build house of similar size. This reduction rises to almost 40 per cent with the inclusion of the EcoHat, 50 per cent when the EcoHat is attached to a hot water system, and more than 70 per cent if the EcoHat utilises geothermal energy sources through a local bore hole.

Each house has a timber frame, made using wood from sustainable forests. The walls are ‘Trespa’ panel cladding, comprising 70 per cent softwood from European renewable forest, inert binding agents and dyes which are metal free. Effective insulation made from recycled paper together with sealed glass panel windows contribute to the air-tight, heat-saving build, while the membrane roofing material and watertight external wall cladding result in increased rain water run-off - which is diverted to large capacity collecting butts. Cladding panel sizes were optimised to reduce waste – leaving only 15 per cent wastage in the manufacture, which is recycled at source and even the delivery was organised to use the most carbon-friendly modes of transport and the quickest routes. This superstructure takes one week to manufacture in the factory before travelling to site as a ‘flat-pack’. The external envelope is assembled in just two days (without the need for scaffolding) to form a waterproof shell. The interiors are completed in two weeks.

Status: Built | Location: Oxley Woods, Milton Keynes, England| Year: 2005 - 2008 | Architect: RSHP | Budget: 15 million GBP | Developer: George Wimpey South Midlands | Client: English Partnerships / Taylor Wimpey | Manufacturer: Wood Newton Ltd | Service Engineer: RYBKA | Landscape Architect: Gillespies LLP | Construction Cost: from £60,000 per unit | Site Area: 3.5 hectares | Floor Area: Approx. 11,136 m² | Number of Houses: 145 Houses including 30 percent affordable houses
 

* If you are not able to see a movie above, please click a link below.
  http://www.youtube.com/watch?v=YUGSz4m6VO8
   
        Architect
www.rsh-p.com


Manufacturer
www.wood-newton.com

BBC News Links
article 1
article 2

BD Magazine Feature
www.bdonline.co.uk

George Wimpey Site
www.oxleywoods.com

English Partnerships
www.designformanufacture.info