___________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________

Parametric Cloud | 전시회 | 서울시 강남구 | 2011
수표지구 주상복합
| 계획 설계 | 서울시 중구 | 2011

  이태원 빌딩 | 기본 계획 | 서울시 이태원동 | 2011
남양주 타운하우스 | 기본설계 | 남양주시 | 2011
국제유통단지 | 기획설계 | 광명시 | 2011
큐브타운
| 기본계획 | 제주도 건입동 | 2011
한남동 갤러리
| 기본계획 | 서울시 한남동 | 2010
NEXON 넥슨 사옥 | 사업성 검토 | 서울시 강남역 | 2010
  예다손 친환경 공장 | 기본계획 | 전라남도 영암군 | 2010
여의도 주상복합 | 기본계획 | 서울시 여의도 | 2010
군산골프장 호텔
| 공사중 | 전라북도 군산시 | 2009-2010
국립현대미술관-서울관 | 공모전 | 서울시 | 2010
거창클럽하우스
| 기본검토 | 경상남도 거창 | 2009
남양휴튼모델하우스 | 디자인 제안 | 경기도 남양주시 | 2009
  Art Fund Pavilion | competition entry | Woking, UK | 2009
Urban Intensity | ongoing research | Worldwide | 2008 - present
City Hall | honourable mention | Sejong, Korea | 2008
Foot Bridge | competition entry | Sheffield, UK | 2007
Asian Cultural Centre | competition entry | Gwangju, Korea | 2005
Mountain Hut | competition entry | California, USA | 2003
  World Trade Centre, Tower 3 | detail design | NY, USA | 2008-2009 | Rogers
60K Housing | built | Milton Keynes, UK | 2007-2008 | Rogers
Javits Convention Centre | concept design | New York, USA | 2006| Rogers
Mixed Use Complex | under construction | Seoul, Korea | 2005 -2008 | Rogers
National Tennis Centre | built | Roehampton, UK | 2004 - 2005 | Hopkins
Maritime Plaza | second prize | Keelung, Taiwan | 2004 | Farjadi Architects
  송원학원 | 완공 | 광주광역시 | 1996 - 1999 | 금성건축
광주시청 | 완공 | 광주광역시 | 1996 - 1999 | 금성건축
의재미술관 | 공모전, 2등 | 광주광역시 | 1997 | 금성건축
   
___________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________   _________________________________________________________________________________________________________________________
NATIONAL TENNIS CENTRE | ROEHAMPTON   Visit National Tennis Centre | www.lta.org.uk   Map | 100 Priory Ln, Wandsworth, London SW15 5JQ                            
A new centre in which to develop the skills of young British players for world class competition.

The site was part of the Bank of England’s sports ground, in South West London. It is metropolitan open land, and the design responds to its setting, preserving existing woodland and using the fall across the site to hide some of the bulk of the building. In parallel with the design, Hopkins and the LTA are seeking to develop a “green” transport plan to minimise impact on the neighbourhood.

The centre provides numerous tennis courts of differing surfaces. It includes accommodation for 8-16 year olds, staying for three-month courses, specialised gymnasia, a sports injury clinic, a facility for training coaches, and offices. Each function requires a different type of space - the indoor courts need large volumes, the gyms must be well serviced, the offices efficient and the residential areas comfortable and homely. Most importantly, all the elements have to come together in a way that gives the sport a strong, appropriate image.

Three-dimensional grid shell, dome-like roofs form the largest volumes covering six in-door courts for year-round use. The gyms and training areas on one side and the residential areas, carefully articulated with balconies and windows, on the other, give scale and richness to the facade. Alongside, joined by a courtyard, are the offices. Each part has a separate identity within an overall composition.

Status: Built | Location: Roehampton, England | Year: 2006-2007 | Architect: Hopkins Architects | Contractor: Exterior Interior | Client: The Lawn Tennis Association | Structure & Service Engineer: ARUP | Landscape Architect: Broadway Malyan | Budget: 21 million GBP | Site Area: 36,000sqm | Gross Floor Area: 11,500sqm | Cost Consultant: Gardnier Theobald | Planning Supervisor: Gardnier & Theobald | Contractor’s Architect: Hurley Robertson and Associates | Contractor’s Engineer: Meinhardt | Planning Consultants: Rolfe Judd | Transport Advisor: Savell Bird Axon | Landlord: Bank of England | Planning Authority: Wandsworth Council
   
View Larger Map